Transmark History


Transmark began operations in 2001 and was originally built to handle large amounts of inbound commodities to supply the large cattle feeding industry in Southern Alberta.

Transmark’s owners, Ronald K. Heggie and Larry Nolan had the foresight and vision while designing the original layout to allow for easy and rapid expansion of their 65 acre site. Transmark worked very closely with Canadian Pacific Railway to create a private rail siding that would allow for optimal fluidity and growth for both the Railroad and Transmark. Transmark has seen tremendous growth and expansion since it opened. Listed Below are some major milestones in Transmark’s history:

-In 2004 the Wind Energy Sector and Canadian Pacific Railway began to utilize Transmark to store and unload windmill components.

-In 2006 Transmark began to store rail cars for various customers.

-In 2007 Transmark expanded by 5 tracks adding 8,000 feet.

-In 2008 Lethbridge Inland Terminal Ltd. opened for business. Located next door to Transmark, both companies shared Canadian Pacific Mainline switch access. Transmark and [R.K. Heggie Grain]() were the founders of this project and are still major owners today.

-Between 2009-2010 Transmark built 7 tracks adding 14,000 feet.

-In 2011 Transmark constructed a lay-down area consisting of 22 acres. This area was levelled and gravelled to the specifications of our windmill customers.

-Also in 2011 Transmark purchased its 1st locomotive.

-In 2014 Construction began on the B-Yard which added six tracks and about 9,262 feet to our facility

-In 2015 Transmark proudly began construction of its new and expanded office building.

-In 2016 construction of the C-yard was started. Since then, over 28 additional tracks have become operational.

-In 2018 the company purchased two locomotives, increasing productivity.